Infrastructure Update

Greater Nashik Metro: India’s First Rubber-Tyred Metro System

The Greater Nashik Metro, popularly known as Metro Neo, is an innovative urban transit initiative being introduced in Nashik, Maharashtra. It represents a pioneering step in Indian public transportation as the first rubber-tyred Mass Rapid Transit System (MRTS) in the country. This next-generation system is designed to provide efficient, eco-friendly, and cost-effective mobility, particularly suited for mid-sized cities like Nashik.

The project is spearheaded by the Maharashtra Metro Rail Corporation Limited (Maha-Metro) in partnership with the City and Industrial Development Corporation (CIDCO) and the Maharashtra Industrial Development Corporation (MIDC).


🚍 System Overview

  • Technology: Metro Neo will use articulated and bi-articulated electric trolleybuses running on rubber tyres, powered via overhead 600–750 V DC traction lines.
  • Capacity: Coaches can accommodate 200 to 300 passengers each, with lengths ranging from 18 to 25 meters.
  • Features: The system will offer air-conditioned coaches, automatic doors, level boarding platforms, real-time announcements, and passenger information systems for enhanced commuter experience.
  • Environmental Impact: With electric propulsion and rubber tyres, Metro Neo will ensure silent operation and reduced emissions, aligning with sustainable urban mobility goals.

🗺️ Route Network

The Metro Neo plan includes two major corridors and two feeder corridors to cover key parts of Greater Nashik:

Primary Corridors:

  1. Corridor 1: Gangapur to Mumbai Naka – 10 km, 10 stations
  2. Corridor 2: Gangapur to Nashik Road – 22 km, 15 stations

A central interchange at CBS (Central Bus Stand) will link both corridors, enabling smooth transfers.

Feeder Corridors:

  • Feeder 1: Satpur Colony – Garware – Mumbai Naka
  • Feeder 2: Nashik Road – Nandur Naka – Shivaji Nagar

This network will enhance connectivity between Nashik’s urban core and its growing suburban areas, including Deolali, Nashik Road, Upnagar, Nashik Airport, Sinnar, Igatpuri, Trimbakeshwar, Dindori, and others.


💰 Project Funding & Status

  • Estimated Project Cost: ₹2,100.6 crore
  • Funding Breakdown:
    • ₹552.19 crore: Maharashtra Government, CIDCO, and Nashik Municipal Corporation
    • ₹387.56 crore: Central Government (Union)
    • ₹1,161.3 crore: Institutional Loans

Currently, the project is awaiting final approval from the Union Cabinet, with renewed efforts underway to expedite the sanctioning process.


🧭 Future Prospects

Metro Neo is designed with future scalability in mind. Should passenger demand increase significantly, the system can be upgraded to a Light Rail Transit (LRT) model. This adaptability ensures that Nashik’s transit infrastructure remains responsive to growth, urban expansion, and environmental priorities.


🏁 Conclusion

The Greater Nashik Metro Neo project represents a transformative leap in urban mobility for Nashik. With its unique combination of cost-efficiency, sustainability, and modern design, it stands as a model for tier-2 cities across India seeking to upgrade their transport systems without the massive costs of conventional metro rail.

Frequently Asked Questions (FAQs) on the Greater Nashik Metro Neo project:

What is the Greater Nashik Metro Neo?

The Greater Nashik Metro Neo is a proposed rubber-tyred metro system designed for Nashik city, Maharashtra. It is India’s first attempt at implementing a Mass Rapid Transit System (MRTS) using rubber-tyred electric buses on dedicated corridors.

How is Metro Neo different from conventional metro rail systems?

Unlike traditional metro trains that run on steel tracks, Metro Neo uses articulated electric trolleybuses with rubber tyres. These vehicles run on dedicated elevated or at-grade corridors and are powered by overhead electric wires, making them quieter, cheaper, and more adaptable for medium-sized cities.

Who is implementing the Metro Neo project?

The project is being implemented by the Maharashtra Metro Rail Corporation Limited (Maha-Metro) in collaboration with:

MIDC (Maharashtra Industrial Development Corporation)

CIDCO (City and Industrial Development Corporation)

What is the length and route of the proposed network?

The Metro Neo network will comprise:
Corridor 1: Gangapur to Mumbai Naka (10 km, 10 stations)
Corridor 2: Gangapur to Nashik Road (22 km, 15 stations)
Additionally, two feeder routes will connect important localities to the main network.

How many passengers can each Metro Neo vehicle carry?

Each vehicle (coach) can accommodate 200 to 300 passengers, depending on the configuration (articulated or bi-articulated).

What are the key features of the Metro Neo coaches?

The coaches will include:
Air conditioning
Automatic doors
Level boarding platforms
Passenger information systems
Real-time announcements
Energy-efficient electric drive

What is the total cost of the project?

The estimated cost of the Greater Nashik Metro Neo project is around ₹2,100.6 crore.

How is the project being funded?

Funding is split as follows:
₹552.19 crore from the Maharashtra Government, CIDCO, and Nashik Municipal Corporation
₹387.56 crore from the Central Government
₹1,161.3 crore through institutional loans

What is the current status of the project?

As of now, the project is awaiting final approval from the Union Cabinet. Discussions are ongoing to move the project forward swiftly.

Can the Metro Neo system be upgraded in the future?

Yes. Metro Neo is designed with scalability in mind. If passenger demand increases, the system can be upgraded to a Light Rail Transit (LRT) system with minimal infrastructural changes.

What areas will benefit from Metro Neo connectivity?

The network aims to connect key urban and suburban zones including:
Nashik Road
Deolali
Satpur
CBS
Mumbai Naka
Trimbakeshwar
Dindori
Sinnar
Nashik Airport
Gangapur Road and more

When will Metro Neo be operational?

The operational timeline will be clearer after Union Cabinet approval. Once approved, construction and commissioning may take around 3 to 4 years.

Leave a Reply

Your email address will not be published. Required fields are marked *

Upcoming Events